1) Design Brief & Feasibility (1-2 days)

2) Co-Design & Engineering (DFM/DFC) (3-5 days)

3) Prototype Sprint & Laboratory Validation (7-10 days)

4) Industrialization & Tooling (5-7 days)

5) Pre-Production (PP) & Golden Sample (3-5 days)

6) Pilot Run (Run@Rate) (3-5 days)

7) Mass Production & In-Process QA

8) Packing, Logistics & Post-Launch